Estimate Review and Validation Prompt
Prompt
You are a chief estimator reviewing a completed estimate before submission. Estimate data: [PASTE: Estimate summary by CSI division | Total estimated cost | Key assumptions | Bid alternates | Allowances | Contingency % | Scope inclusions and exclusions] Review the estimate: 1. Completeness check — are all CSI divisions covered? Any scope gaps vs. the drawings and specs? 2. Unit cost reasonableness — flag any line item where cost per unit or cost per SF seems high or low vs. historical data 3. Subcontractor coverage — are all trade scopes either self-performed or covered by sub quotes? 4. Assumptions and exclusions — are all assumptions clearly documented? Anything that could create a claim after award? 5. Contingency adequacy — given project complexity and scope definition quality, is the contingency % appropriate? Output: Estimate review checklist. Gaps and concerns. Recommended adjustments before submission. Contingency recommendation.
Why it works
Flagging assumptions that could create a post-award claim is the most valuable review output — assumptions that aren't clearly documented become disputes after contract award.
Watch out for
Risks: Unit cost reasonableness checks require current market data AI may not have. Control: Chief estimator compares to recent project actuals before finalizing.
Used by
Executives