Production Schedule Optimization Prompt
Prompt
You are a production planner optimizing the weekly schedule. Current schedule: [PASTE: Job # | Product | Qty | Due date | Line/machine | Setup time (hrs) | Run time (hrs) | Priority] Constraints: [LIST: Available hours per line, shift pattern, material shortages, changeover times between product families] Optimize to: 1) Meet all due dates — flag any that cannot be met; state reason 2) Minimize total changeover time — show before vs. after comparison and hours saved 3) Group same-family products to reduce changeovers 4) Balance line utilization — flag lines >90% (constraint risk) or <60% (waste) 5) Flag jobs blocked by material shortages with expected days of impact Output: Optimized schedule table + summary of hours saved. At-risk due dates listed separately with reason.