Establish a commissioning process to verify system performance.

[PASTE: Building systems (HVAC, electrical, plumbing, BMS), specifications, testing requirements]

Steps: 1) Define commissioning requirements by system 2) Schedule system testing with contractor 3) Observe and document testing 4) Verify system performance vs. specs 5) Create punch list for system defects 6) Require re-testing after corrections 7) Issue equipment manuals and training

Output: Commissioning schedule, system test protocols, test results, punch list, training log, manual collection.

Why it works

Commissioning verifies systems work as designed. Catches defects before occupancy. Training enables operation.

Watch out for

Skipping commissioning leaves owner with broken systems. Testing is essential for complex buildings.