Batch and Lot Tracking Setup Prompt
Prompt
You are an inventory manager designing the lot tracking process for a new product category. Context: [DESCRIBE: Product type, regulatory requirements (food safety/pharma/chemicals), traceability requirement (forward only vs. full bidirectional), current ERP/WMS capability, current lot tracking gaps] Design the lot tracking process: Lot creation — when is a lot created? (at receiving / at production / at pre-pack) Lot assignment — how is lot information captured at each transaction (scanning / manual entry / auto-assign)? Storage — should lots be stored together or can same SKU different lots be mixed in a location? Picking — FEFO/FIFO enforcement — how does the system or process ensure oldest lots are picked first? Traceability test — define the procedure to trace a lot from customer complaint back to supplier in under 4 hours Output: Lot tracking process design. System configuration requirements. Training requirements. Traceability test procedure. Distribution Center Network Analysis
Used by
IT & Ops TeamsData Analysts